Recycled Water Improvement Project Update 07/6/20

Creekside Recycle Water Improvement Project

Below is the status update regarding the construction activities that will be occurring in the Creekside Community for the Ontario Municipal Utilities Company Recycled Water Improvements Project.

CONSTRUCTION UPDATE: 7/6/2020 TO 7/10/2020   

  • The activities during the period of 7/6/2020 to 7/10/2020 will be on East Creekside Drive between South Haven Avenue and Deer Creek Loop and from East Creekside Drive to East Elsinore Way (along Deer Creek Loop).  The intersection with East Elsinore Way and Deer Creek Loop will also be closed. 
  • Access will be allowed at the intersection of Honeybrook Way and Deer Creek Loop for cross traffic only. Please follow all signage and site personnel directions. 
  • Due to heavy construction, all lanes will be closed. The contractor will allow emergency vehicle access only. 
  • The sidewalks may also be closed, for increased safety.

CONSTRUCTION UPDATES: 07/13/2020

On Monday (7/13/2020), East Elsinore Way and the intersection with Deer Creek Loop will be closed. 

  • Please drive cautiously and follow all signage and site personnel directions. 
  • The contractor will allow emergency vehicle access. 
  • The sidewalks will be closed, for increased safety.

CONSTRUCTION UPDATES: 7/14/2020 to 7/17/2020

  • From Tuesday (7/14/2020) to Friday (7/17/2020), the contractor will proceed south from East Creekside Drive to about Ashgate Way.  Site personnel will guide/assist traffic coming from Poplar Drive and Laureltree Drive.
  • Due to heavy construction, all lanes will be closed.
  • Please drive cautiously and follow all signage and site personnel directions. 
  • The contractor will allow emergency vehicle access. 
  •    The sidewalks will be closed, for increased safety.